CONSTRUCTION UPDATE
Crew A - Crews will be working on both the sewer lift station, just west of the Blacksmith Fork River on 2900 South, and general clean up around town.
Crew B - Crews will be working on lateral line connections on 350 North between 200 East and 350 East. This area will be closed to through traffic while work is being completed.
Crew C - Crews are placing the sewer main line on Main Street between Center Street and 100 North.
Crew D - Crews will be boring the sewer lines along the Highway 165 around 4400 South. The bulk of this work will be in the shoulders. Expect some traffic shifts.
Crew F - Crews continue to work on the sewer main line on 300 South between 100 East and 200 East. Once they are done in this area, this crew will continue to work east on 300 South between 200 East and 300 East.
Crew G - Crews will be working on the lateral line connections on 500 North between 200 East and 300 East. This area will be closed to through traffic while work is being completed.
Sewer work on Highway 165 will start in May. Much of this work will be done via lateral boring. Traffic control and road closures will be shifting frequently. Be extra cautious as driving between Millville and Hyrum.
**Lateral lines will run from the main line to the property line. Home owners will be responsible to connect their home to the lateral line after sewer construction is completed.**
ROAD CLOSURES
500 North, between 200 East and 300 East will be closed from mid-April to the early May
350 North, between 300 East and 350 East will be closed from mid-May to late May/
Main Street, between Center Street 100 North will be closed until the middle of May
300 South, between 100 East and 200 East, will be closed until the mid-May
**Please stay out of the construction zone. Do not drive on a closed road, unless you are trying to reach a house on that block.**