CONSTRUCTION UPDATE


Crew Assignments:

  • Crew A: Ongoing sprinkler repairs throughout town.

  • Crew B: Sidewalk repairs and other concrete work in various locations.

  • Crew C: Installing lateral sewer lines on 300 South (between 100 West and Main Street).

  • Crew D: Installing the main sewer line on 550 East, north of Center Street.

  • Crew E: Preparing for landscaping repairs, including backfilling lateral line trenches.


Important Note:

Lateral lines will run from the main sewer line to each property line. Homeowners are responsible for connecting their homes to the lateral line after sewer construction is completed.


ROAD CLOSURES


  • 550 East, north of Center Street, will be closed until mid July

  • 300 South, between 100 West and Main Street, will be closed until mid July.


Please stay out of the construction zone. Do not drive on a closed road, unless you are trying to reach a house on that block.




 
 
 